Carrefour Capital Connexion Capital Connexion
Carrefour-Capital
Change area | Home | Français | 中文 | Open a session

Change currency
Welcome Tips Confidentiality Links Press release FAQ Accreditation request

Back

Detailed informations of a business project

Record number: 3016712
No
Congo, Kinshasa,
INEWCORP has a mission to:
- be a world-leading integrator and architect of ecotechnological projects and operations in the sector of waste to energy and related applications. 
- utilize the best, proven technologies and to set the world standard in our sector coupled with leading environmental, corporate and social responsibility coupled with proven sustainability.
- contribute to the improvement of the environment for all living things on this planet while developing an environmentally conscious and sustainable environment for its inhabitants...

our main services:

1- Waste to Energy
- Waste transformation into Power and fertilzer for developing countries
- garbage collection (optional for the client of Waste to Energy)
- production of Bio-fuel
- green technologies
2- Green village
Eco Agri-Business Industrial Community tat includes
self-sustaining income producing projects ( Housing, farming, power generation, clea water, infrastructure, ....)

3- peoject management and intermadiation



112,065,745$ +/- 28,016,436$
The project is a clean design mechanism consisting in financing, installing and operating under BOOT ( Build Operate Own and Transfer) of many complexes to transform waste into electricity and fertilizer using green technologies (Biomethanation, RDF and fast composting). Each plant will range from 600 TPD to 2000 Ton per Day of waste to be transformed into power and fertilizer.

The contracts are signed with the federal government for 10 cities in DRC including Kinshasa with 2 plant of 2000 TPD each

- for a plant of 2000 TPD the Cost is : 200 millions USD to 300 000 millions each
- for the plant of 600TPD the cost is 90 millions USD
- The tippinf fees are 35USD/Ton with an annuaal increase for the 30 years of the BOOT
- the power is solde for 0.12 USD/KWH with annual increas for 30 YEars of the BOOT

- The mnimum expected return: IRR > 25%, payback period <7 ears, minimum NPV:300 millions

- Additional sources of revenue: Carbon credits, Sales of recyclable material, Spin-off industries.

- great impacts ( economical well being, social well being, environmental well being and technological well being)

To determined
30 %
20%
a_determiner
waste to energy
Yes
Others
Energy, environment technology
Starting
The technology can be use to resolve the waste dilemma in any city. It's green and can be used to treat all the municipal waste.
For now, the team had defend the technologies worldwide and got thumb-up everywhere. But, the company is willing to focus mainly, for now, on developing countries. Therefore, some negotiation have been conducted in many countries and the authorities of those countries are expecting the delegation to got back and finalize the contracts the start the realization of the project. Among those countries are: Ivory Cost, Burkina Faso, South Africa, Congo Brazzaville, Ghana, Senegal, Niger and a couple of Asian countries ( Malaysia and China).

The contracys are signed for DRC that gives 11 plants for the 10 major cities of the country.

- Guinea is getting ready to sign for 5 cities

- Ivory cost is waiting
- A mafor Green village project accepted in Niger for 20 000 houses and a piece of land of 20 0000 ha identified and reserved for the project of green village

Could be consider as competitors the companies using:

- Landfill: but that one still pollutes the environment and uses a lot of land which can hardly be recovered for other usage.
- The pyrolysis: good for medical waste and tires but cost a lot not so good for the all the waste
- Plasma technologies: very expensive and can hardly be used in developing countries because it requires huge investment and hug bill.
- The gasification: requires high temperature process, so not cost effective,
the most known is Veolia environnement

In the developing countries ( targeted market)there are seldom companies. But, as it is a good business some northen companies start working there and the competition will increase in future years. This is why our contracts are solids and strong enuogh to cover us for de duration of 25 to 30 years.
8
Most of the member of the management team are B.Sc.Eng./MBA, with minimum 15 years of experience.
Dramane ZIAO, Engineer/ Master in Management/ MBA in banking and finances : President and C.E.O, Senior manager: Specialist of start ups, restructuring of companies, management and business development. He has experience in the installation of factories, the project management and the business development internationally. With over 15 years experience in leadership positions , he excels in the team management in multicultural environment, he was UNIDO ( United Nation Industrial Development Organization) consultant for upgrading of companies. Tel: 1 54 571 5275, Email: dziao@inecorp.com

Jean-Pierre DUBE, Engineer/ Master in Engineering, Senior Vice-President: at least 35 years of experience in multinational corporation, specialist of team building, project management and engineering. He has managed major projects worldwide including Africa and succeed in positions of President
2014
Assets: 0$
Liabilities: 0$
Fiscal year Sales Net earnings
Three years ago (Y-3) 0$ 0$
Two years ago (Y-2) 0$ 0$
Last fiscal year (Y-1) 0$ 0$
Forecast actual year (Y0) 0$ 0$
Forecast next year (Y1) 0$ 0$
Forecast year after(Y2) 0$ 0$
The project has been signed with the federal government of DRC for the whole country of Democrated Republic of Congo ( the reachess country in the world in terms of mineral and natural ressources)
- the promoters are flexible now and ready to have a look on any serious proposal.
- The investor can be interested in a smaller plant (less investment) because there are some plants of 600 Tons par day or 1000 tons a day prepared also to be signed.
- the investor may also be interested in a different country. The network is set up execute that kind of request.



OVERVIEW OF THE CONTRACTS SIGNED IN DRC:

- General aspects of the contract:
* The contract is a BOOT of 25 years
* The contract is under the law of the ICC (international Chamber of commerce)
* The settlement of any conflicts is done in Switzerland or under another neutral jurisdiction
* The language of the contract is English and French
* A committee is set up by both parties to monitor the project and weigh the waste with computers and Weighbridges.
* Government is contractually bound otherwise it reimburses the total investment plus penalties.
* The government assists to get the MIGA ( Multilateral Investments Guarantee Agency) of the world bank.


- summary of the engagements of the cities in the contracts: The city’s obligations:
* deliver the waste to the complex and pays the tipping fees in USD per ton
* assist the company to get all permits and clearances
* authorize the company to take the water for its operation, from any source available in the area even underground,
* provide the land of 25 acres for free to install each complex
* guarantee the payment of the tipping fees (the minister of finance signs, the minister of environment signs and the Governor/Mayor signs)
* guarantee the quality and the quantity of the waste to deliver everyday to the complex during the lifetime of the project ( 25 years)
* issue an irrevocable letter of credit that the company can use to pay itself if there is any delay on the payment of the weekly bill
* No interference with the management of the company
* investor has the right to transfer revenue to any place in the world with no limit in terms or amounts
* Assist the company to attain the tax exemptions with respect of the local legislation
* Determine on its expenses a landfill for the residual waste and the waste the company may refuse
* Guarantee the purchase of the power by the power corporation


- NO SERIOUS COMPETITION FOR NOW:

The competition for the waste management exists, but the direct competition to INEWCORP is rare. Most of the companies doing the waste treatment use one specific technology, leaving aside huge quantity of waste to be sent to the dump or just burnt (polluting.
INEWCORP's process uses all the waste, then separate it into different types of waste, then uses different kind of technology to treat each type. Even-though the technologies are well known, the process is innovative and it optimize the output and the cost.
The targeted market reduces also the competition: there is no company capable to treat all the waste up to 2000 Tons a day in the places the negotiations were done.

MISE EN GARDE : EN L'ABSENCE DE VEILLEUR DANS LA LOCALITÉ DE CETTE ENTREPRISE, LA FICHE A ÉTÉ VALIDÉE TEMPORAIREMENT APRES ANALYSE SOMMAIRE DU PROJET PAR L'ADMINISTRATEUR CARREFOUR-CAPITAL.

WARNING : SINCE THERE IS NO GATEKEEPER YET IN THIS BUSINESS AREA, THIS RECORD HAS BEEN VALIDATED ON A TEMPORARILY BASIS, BY CAPITAL-CONNEXION ADMINISTRATOR.


Vous devez 

Vous devez 

Organization in charge of Capital Connexion
Carrefour-Capital
CC
Connexion-E
http://www.carrefour-capital.com

Your own space

To access your personnal space you have to



Stat

Registered gatekeepers :19
Number of private investors registered :303
Value of available investments :933,241,706$
Number of businesses registered :1080
Number of venture capitalists :48
Total funding available :1,427,932,792$

X Close